Levels of expertise, conditions, and order of separate operations
Find out when the specialization opened and what processes it can progress with at the same time.
How it works
- Requirement formula: required building level = 2 + current module level × 3; at building level 14 every module can reach level 5.
- Three queues run separately in the same village: construction (1 slot + the shared extra slot), stage (1 job) and specialisation (1 job).
- A stage upgrade cannot start while construction is running; a specialisation can start while construction and stage jobs are running.
Step by step
- Compare the current impact with the next level effect on the Specialty tab of the building.
- Complete the main building level required for the next specialization.
- Give the order of expertise; the cost falls from the active village at the time of the order.
- Follow the progress of expertise in Agenda. Village step development can take place at the same time during the separate process.
- Remember that the effect will be applied only as soon as the expertise is completed.
Key numbers
- Specialization 1
- Building level 2
- Specialization 2
- Building level 5
- Specialization 3
- Building level 8
- Specialization 4
- Building level 11
- Specialization 5
- Building level 14 — Each specialty increases to a maximum of 5 levels.
A second specialty job in the same village cannot be started before the active expertise is completed.
← In-building expertise development · What system do basic buildings affect? →